Lubricating machine inspection and working load
Source: | Author:xingdamachinery | Published time: 2017-07-20 | 414 Views | Share:

In the process of operation, the drilling rig is a special vehicle, and its operators should receive training and guidance from the manufacturer. The machine structure can be operated to a certain extent to obtain certain operation and maintenance experience. The product maintenance and repair instructions provided by the manufacturer are the necessary information for the operator to operate the equipment. Before operating the machine, be sure to read the maintenance instructions and operate and maintain according to the requirements of the manual.

 

When the rig is running, it is necessary to pay attention to frequently check the lubricating oil, coolant, brake fluid, hydraulic oil and fuel oil (water) position and quality, and pay attention to check the sealing performance of the whole machine. If too much oil and water are found in the inspection, the reason should be analyzed. . At the same time, the lubrication of each lubrication point should be strengthened. It is recommended that the lubrication point be filled with grease for each shift during the running-in period (except for special requirements).

 

To a certain extent, a drilling rig needs to keep its machine clean and make timely adjustments to tighten loose parts, so as to prevent parts from being worn out or lost due to loose parts to a certain extent.

 

To a certain extent, attention should be paid to the working load during the running-in period. Generally, the working load during the running-in period should not exceed 80% of the rated working load, and appropriate workload should be arranged to prevent the occurrence of overheating caused by continuous operation of the machine for a long time.

 

The drilling rig should observe the instructions of each instrument frequently. If there is any abnormality, it should stop the operation in time to eliminate it. Before the reason is found and the fault is not eliminated, the operation should be stopped.As long as the attention and according to the requirements of the implementation of the construction machinery run-in period of maintenance and maintenance, will reduce the occurrence of early failure, extend the service life, improve the efficiency of the operation, and bring more benefits to the machine.